steltek
![jonathan-bean-tb1JFTlse20-unsplash.jpg](https://static.wixstatic.com/media/437a46_1455a315599e4d4ab78cc0c63d54fd55~mv2.jpg/v1/fill/w_779,h_520,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/437a46_1455a315599e4d4ab78cc0c63d54fd55~mv2.jpg)
โครงการ
โครงการ
ประสิทธิภาพที่ก้าวล้ำหน้า
Operational requirements
24/7
The Problem
Operating round-the-clock, our client's facility demanded a swift yet strategic approach to upgrades, all within a tight one-week shutdown timeframe. Leveraging our wealth of experience, we ensured seamless coordination of tasks, maximizing efficiency while minimizing disruption.
The Result
A flawlessly executed upgrade initiative that met stringent deadlines, empowering our client to resume operations swiftly with enhanced capabilities.
โครงการ
ประสิทธิภาพที่ก้าวล้ำหน้า
Core Challenges
3+
-
Security Vulnerabilities: The proliferation of interconnected medical devices and systems in the IoMT networks posed inherent security risks.
-
Legacy Network Infrastructure: Outdated network infrastructure, including obsolete firewall configurations and aging equipment, presented obstacles to effective threat detection and mitigation.
-
Compliance Requirements: The hospital group were subject to stringent regulatory mandates and compliance standards.